Hirakud I Burla Hydro Project

Hirakud I Burla Hydro Project.jpg

Hirakud Hydroelectric Project Burla is erected 15 km Northwest from Sambalpur of Odisha, India. The power plant is commissioned in 1957. It has an approved and installed capacity of 276 MW. The type of power project is Major due to its greater capacity than 25 MW. The status of Hirakud I Burla Hydro Project is completed and are functional. The power project is situated in the Mahanadi River and the main Reservoir is Hirakud. The name of dam in which the hydro project is built is Hirakud Dam. The power plant is owned by the Odisha State Government and the operator of the plant is Odisha Hydro Power Corporation (OHPC).

The beneficiary states of the power plant are Odisha and nearby States. The hydro project is completed and started the generation of power from 1957 onwards. The total number of turbines in the plant is seven. The capacity of first two turbines commissioned are 49.5 MW, the third and fourth turbine each have 32 MW and the last three turbines have 37.5 MW each. Kaplan is the type of turbine used in the plant. The manufacturer of turbines of first two units of plant is by the English Electric UK and the turbines of third and fourth units is by the J.M. Voith Germany and the turbines of last three units is by the Hitachi Japan. The Generators are manufactured by the GEC Alston, Voith Siemens and Hitachi Japan.

The unit size of power plant is 276 MW having seven total units and all the seven units are commissioned.

How to Reach: Hirakud I Burla Hydro Project islocated at about 15 km Northwest of Sambalpur inthe state of Odisha in India. You can reach this destination via Road, Rail or Air. By Road, you will get continuous bus and taxi services from Sambalpur. Sambalpur Railway Station is the nearest well-connected railway station and BijuPatnaik Airport is the nearest Airport.

Project Details:

• Hydroelectric Project Name – Hirakud I Burla Hydro Project

• Commission Date – 1957

• Approved Capacity in MW – 276 MW

• Installed Capacity in MW – 276 MW

• Type of Project – Major

• Status – Completed and Operational

• River - Mahanadi River

• Main Reservoir –Hirakud

• Dam Name–Hirakud Dam

• Owner – StateGovernment

• Operating Company – Odisha Hydro Power Corporation (OHPC)

• Address – 15 km NW from Sambalpur, Orissa, India

• District -Sambalpur

• State – Odisha

• Contact Number – 0674-2542983, 2542802, 2545526, 2542826

• Email – ohpc.co@gmail.com

• Website – www.ohpcltd.com

• Beneficiary States/ Union Territories – Odisha and nearby States

• Completion of Power Project – 1957

• Number of Turbines – 7

• Capacity per Turbine – 49.5 MW x 2, 32 MW x 2, 37.5 MW x 3

• Type of Turbine - Kaplan

• Turbine Maker – English Electric UK, J.M. Voith Germany, Hitachi Japan

• Generator Maker – GEC Alston, Voith Siemens, Hitachi Japan

• Unit Sizes – 276 MW

• Total Units – 7

• Units Commissioned – All the seven units are commissioned