Giri Hydel Project

River Giri.jpg

The power plant is situated on the river Giri of the Sirmour District of Himachal Pradesh. Giri Hydroelectric project has a total installed capacity of 60 Megawatts, with 2 units of 30 Megawatt each. This project, which is run-off-the-river scheme operated by Himachal Pradesh State Electricity Board and is operational for 29 years.

Giri Hydroelectric Project is commissioned in April 1978. It has an approved and installed capacity of 60 Megawatt. The type of project is Major, since it is greater than 25 MW. The status of power plant is completed and are Operational. The source of water for the generation of electricity is Giri River. The basin of power plant is Indus River till the country’s border and the hydroelectric region is North Hydroelectric Region. The power plant is operated by the HPSEB.

The beneficiary states of the hydroelectric power plant are Himachal Pradesh and other North Indian States. The completion of power projectwas in 1978 and soon the commercial operation of the power plant is started. The type of Turbine used is Francis. The turbine and generator manufacturer of the power plant is Bharat Heavy Electricals Limited. The unit sizes of the power plant is 60 Megawatt (2 units x 30 MW). There are two units in Operation and all the two units are commissioned.

How to Reach: The Giri Hydroelectric Project is located in the Giri river of Mahrar town in Sirmourof Himachal Pradesh. You can arrive this hydel power station via Road, Rail or Air. The nearest well-connected town/village to power station is Sirmaur. Sirmaur is located at about 16 kilometer from the power Station. Regular buses and Taxi services are accessible from the Sirmaur town to the power station. Jagadhri Railway Station is the nearest major railway station, which is located at about 52.5 km awayfrom the power station.Jolly Grant Airport is the nearest well-connected Airport.

Project Details:

• Hydroelectric Project Name –Giri Hydroelectric Project

• Commission Date – April 1978

• Approved Capacity in MW – 60 Megawatt

• Installed Capacity in MW – 60 Megawatt

• Type of Project – Major (since greater than 25 MW)

• Status – Completed and Operational

• Water Source – Giri River

• Basin – Indus River

• Hydroelectric Region – North

• Owner – Himachal Pradesh State Electricity Board

• Address –Mahrar, Sirmaur district, Himachal Pradesh

• District – Sirmaur

• State – Himachal Pradesh

• Contact Number –

• Fax –

• Email – info@hpseb.in

• Website – www.hpseb.in

• Beneficiary States/ Union Territories – Himachal Pradesh and other North Indian States

• Completion of Power Project– 1978

• Turbine Type – Francis

• Turbine Manufacturer – Bharat Heavy Electricals Limited

• Generator Manufacturer – Bharat Heavy Electricals Limited

• Unit Sizes – 60 Megawatt (2 units x 30 MW)

• Total Units - 2

• Units Commissioned – All the two units are commissioned.